INSTALLATION OF A SOLVENT EFFLUENT TREATMENT SYSTEM AND INCREASE IN SOLVENT EXTRACTION CAPACITY.
Within the framework of this project, ATRIX teams managed all phases (APS-APD-PRO-DCE-ACT-VISA-DET-AOR), including the creation of a numerical model of two solvent extraction networks.
The design and works were carried out in an occupied site (24 hours operation, 365 days a year, no annual maintenance shutdown).
FAB 92 building
Building FAB 97 and Support 2
Building Crolles 1 Bis
FAB 92 building
Building FAB 97 and Support 2
Building Crolles 1 Bis