Soitec has entrusted ATRIX's teams with the construction of a new building in Isère, including the following missions :
Installation of an 80,000m3/h air handling unit and its chamber / Paralleling of all existing B1 and B2 air handling units
Upgrading of the existing PCW installation in the basement of the K-building and realization of a second installation of 40 m3/h.
Upgrade REC30/31/32/33 Building C basement Site supervision
Replacement of a chilled water unit in the cold room – Building E Bernin 1 sites
Installation of an 80,000m3/h air handling unit and its chamber / Paralleling of all existing B1 and B2 air handling units
Upgrading of the existing PCW installation in the basement of the K-building and realization of a second installation of 40 m3/h.
Upgrade REC30/31/32/33 Building C basement Site supervision
Replacement of a chilled water unit in the cold room – Building E Bernin 1 sites