PACKAGE MONITORING FACILITY AT THE AUBE DISPOSAL CENTER (CSA)
Following a recommendation from the French Nuclear Safety Authority (ASN), Andra's Aube disposal center (CSA) has decided to set up a control unit dedicated to second-level monitoring of waste packages delivered to the site.
This project consists of the rehabilitation of an existing hall in the Waste Conditioning Workshop (ACD), which will be completely refurbished and extended to accommodate the processes related to the various controls that were previously outsourced by ANDRA.
The project is carried out in the form of a complete project management including all the tasks from the preliminary design studies to the assistance to the acceptance operations of the installation. The “Nuclear Processes” and “Handling” work packages are under the responsibility of ATRIX. The specific safety missions (all analyses and preparation of safety reports submitted to the ASN) were also carried out by ATRIX.
Some points of detail :
The project is carried out in the form of a complete project management including all the tasks from the preliminary design studies to the assistance to the acceptance operations of the installation. The “Nuclear Processes” and “Handling” work packages are under the responsibility of ATRIX. The specific safety missions (all analyses and preparation of safety reports submitted to the ASN) were also carried out by ATRIX.
Some points of detail :