HEP FACTORS
CLIENTS REFERENCES

Below are some of the references made by HEP Factors teams:

ORANO
Donneur d'ordre : ORANO
Mission : HMI
Période :

Analysis of work constraints in a contaminated environment for a project involving the installation of new granulation machines, the re-engineering of a nuclear fuel conditioning unit and the specification of the of the control supervision HMI

AIR France
Donneur d'ordre : AIR France
Mission : FOH studies
Période :

AMOA of several architectural projects and workstation layout (Charles de Gaulles / Orly): engine test bench, U3 engine maintenance workshop, PIM2 engine maintenance workshop, first class lounge, future Cargo room, T2E baggage sorting supervision room, specifications and HMI mock-up for the ORA parking tool and for the baggage sorting maintenance – operation supervision

SANOFI
Donneur d'ordre : SANOFI
Mission : TMS diagnosis
Période :

MSD diagnosis and industrial performance and training-action on the prevention of occupational risks and MSD

EDF
Donneur d'ordre : EDF
Mission : FOH studies
Période :

SOH analyses for nuclear reactor (de)loading operations, studies on the organisation of boric acid supply

CEA
Donneur d'ordre : CEA
Mission : FOH studies
Période :

As part of the ESPADON project, preliminary design studies for handling and storage facilities for radioactive substances in vertical shafts: realization of all FOH analyses to define sensitive activities and to identify the principles to be adopted for the design of the equipment

CEA
Donneur d'ordre : CEA
Mission : FOH studies
Période :

Assistance to the DIADEM macroscopic and microscopic FOH studies for the redesign of a nuclear waste treatment unit, specifications of the control supervision HMI and design of the control room, FOH training

A 360° OFFER

Our approach is based on taking into account the needs of all users. Our role is to articulate these needs with the organization’s various requirements, which may be technical, regulatory, operational or safety-related…

The global offer that we propose is based on an iterative work method that consists in integrating future needs into the design choices.

DISCOVER THE OTHER
SUBSIDIARIES OF THE GROUP

Architecture and building engineering

Industrial processes and risk management

Organisational and human factors