FAURE QEI
CLIENTS REFERENCES

Below you will find some references made by Faure QEI teams:

SCI CLEANSPACE Montmélian (73)
Donneur d'ordre : SCI CLEANSPACE
Mission : PROJECT MANAGEMENT ; PRO - ACT - VISA - DET phases / Mission started at each installation of new tenants
Période : 2010-2013

Refurbishment of the Cleanspace building with ISO 6 to ISO 8 classified clean rooms, offices, common areas and sanitary facilities

CORNEAL ALLERGAN -Pringy (74)
Donneur d'ordre : CORNEAL ALLERGAN
Mission : CLE EN MAINS including QI-QO
Période : 2008-2009

Refurbishment of an existing building for the pharmaceutical production of syringe filling

REGION LORRAINE, Lycée de Tomblaine (54)
Donneur d'ordre : The Lorraine Region
Mission : PROJECT MANAGEMENT ; ESQ - APS - APD - PRO - EXE - ACT - DET - AOR - ASSISTANCE COORDINATION SSI - OPERATION & MAINTENANCE
Période : 2014-2016

Construction of the biology and microbiology centre at the Arthur Varoquaux Regional High School in Tomblaine – ERP Type R

CEA MARCOULE, Bagnols sur Cèze (30)
Donneur d'ordre : CEA MARCOULE
Mission : FULL PROJECT MANAGEMENT From the preliminary design studies to the assistance to the acceptance operations of the installation
Période : 2008-2017

DIADEM project – Building for the treatment and storage of highly irradiating waste from the dismantling of CEA facilities

CNRS MARSEILLE (13)
Donneur d'ordre : CNRS Marseille
Mission : Audit and clean concept training / ESD audit
Période : 2014

LAM (Marseille Astrophysics Laboratory) and CPPM (Marseille Particle Physics Centre)
Clean concept audit and training / ESD audit

CEA GRENOBLE (38)
Donneur d'ordre : CEA GRENOBLE
Mission : Measurement, control and diagnostic services with high added value (Framework agreement)
Période : For more than 12 years

Measurement, control and diagnostic services for the operating specifications of the LETI/MINATEC cluster’s clean rooms, premises and related equipment

A 360° OFFER

Our services cover all stages of the life cycle of your environments, whether they are controlled atmosphere or much more conventional and tertiary.

Thus, within the framework of a new project, we assist you from the first expressions of needs and programmatic ideas, to then accompany you during all the phases of studies and works of the project, and to take part in its acceptance and its good starting up.

In support of the operator or future operator, we intervene at a very early stage in the investment process, providing technical and/or programmatic expertise, as well as helping each operator to make a robust diagnosis of his environment (audits, measurements, etc.), so as to be able to develop and optimize its operation.

SUPPORTING YOU AT EVERY STAGE OF YOUR PROJECT
  • Building appraisals for cleanrooms: compatibility or otherwise of load-bearing structures, heights and surfaces with the future environment, audit of existing installations and identification of possible reallocations
  • Design of master plans and/or functional and technical programs for the evolution of complete sites and buildings
  • Assisting the project owner in the phases of defining requirements and budgetary frameworks, and proposing budgetary phasing to smooth out investment and the ramp-up of installations.
  • 20 years of REX and budget estimates on all types of ZACs
  • Consolidation of feasibility, budget estimate and construction schedule
  • Layout plans and descriptive diagrams
  • 3D scanning and digitization of existing systems
  • Risk analysis: safety, ATEX, virology
  • Finite element modeling of 3D flows
  • Proposals from technically and economically competent companies
  • Methodological input and feedback for multi-criteria choices
  • OPC
  • CSSI
  • Technical briefings with business specialists
  • Critical analysis of technical counter-proposals and any requests for modifications from companies
  • HVAC systems tuning
  • Participation in control and command testing
  • QC / IQ / OQ / PQ in accordance with European best practice guidelines
  • Possibility of critical analysis and/or countermeasures
  • Hook-up of microelectronic equipment
  • Air and energy measurement
  • Regular or incidental measurements of environmental characteristics
  • Audits and risk analyses of existing sites and facilities
  • Training staff in ZAC management, clean-concept, regulatory context…
  • HVAC, control and energy optimization…
  • Scalable, modular controlled-atmosphere zones
DISCOVER THE OTHER
SUBSIDIARIES OF THE GROUP

Architecture and building engineering

Industrial processes and risk management

Organisational and human factors