ASTRAZENECA

Lieu du projet : Dunkerque
Période : 2016 - 2017
Donneur d'ordre : AstraZeneca
Mission : Project management
Montant des travaux : Between 5 and 15 M€

EXTENSION OF THE QC LAB (EVEREST PROJECT)

ATRIX was mandated by the AstraZeneca group to intervene on the quality control laboratory of the pharmaceutical factory in Dunkirk (production of inhalers):

  • Consolidation of all quality control activities in the same building and increase of the analysis capacity
  • Complete revamping of one floor 2,500 m², with other floors in operation, non-classified laboratories 1,200 m².
  • More than 1000 m² of classified areas, project realized according to GLP (European normative reference for laboratories)